
Chennai Metro Rail Restricted (CMRL)
| Photograph Credit score:
JOTHI RAMALINGAM B
A load deflection check utilizing a loaded wagon was carried out on Friday within the MRTS Part II extension between Velachery and St Thomas Mount railway stations in Chennai, in accordance with a launch.
The check was performed by the Building Division
The assessments will proceed all through this month to make sure the security and operational readiness of the road. The general public and media might be knowledgeable upfront if a trial run is performed, the discharge mentioned.
The Southern Railway’s Chennai Division mentioned opposite to reviews in media, no trial run was performed on this part on Friday.
Revealed on November 7, 2025

