
The corporate’s analysis and improvement arm, ONGC Vitality Centre, drilled the effectively to a depth of 1,000 metres at an altitude of greater than 14,000 ft in a few month, enhancing on the timeline and value of its first geothermal drilling marketing campaign, ONGC mentioned in a social media submit.
| Picture Credit score:
REUTERS/BHAWIKA CHHABRA
State-run Oil and Pure Fuel Company (ONGC) has accomplished drilling its second geothermal effectively in Ladakh’s Puga Valley, marking one other step in the direction of growing India’s first pilot geothermal energy plant.
The corporate’s analysis and improvement arm, ONGC Vitality Centre, drilled the effectively to a depth of 1,000 metres at an altitude of greater than 14,000 ft in a few month, enhancing on the timeline and value of its first geothermal drilling marketing campaign, ONGC mentioned in a social media submit.
The most recent effectively builds on the success of ONGC’s first geothermal effectively in Puga, which produced steam at temperatures above the boiling level of water, demonstrating the world’s geothermal useful resource potential, the corporate mentioned.
ONGC mentioned the second effectively would assist the event of India’s first 1-megawatt electrical (MWe) pilot geothermal energy plant and will pave the best way for business exploitation of geothermal power within the nation.
The mission’s subsequent part consists of plans to arrange a 1-megawatt electrical (MWe) pilot geothermal energy plant and the longer-term improvement of geothermal assets to supply dependable baseload electrical energy for Ladakh.
The Puga geothermal area, situated in japanese Ladakh, is taken into account India’s most promising geothermal useful resource.
Geothermal power harnesses warmth from beneath the earth’s floor to generate electrical energy and supply heating, and gives a supply of round the clock, low-carbon energy, not like photo voltaic and wind power, whose output is determined by climate circumstances.
The Puga geothermal area in Ladakh has lengthy been recognized as India’s most promising geothermal useful resource. Whereas exploratory work has been carried out intermittently for many years, business geothermal energy technology has but to take off within the nation due to technical and financial challenges.
India is searching for to diversify its renewable power combine past photo voltaic, wind and hydropower as it really works in the direction of its goal of putting in 500 GW of non-fossil-fuel electrical energy capability by 2030.
Printed on July 12, 2026
